Menu

Find a calculator, bed size or guide

How much sod do you need?

Count the square feet of lawn, then divide by what one roll and one pallet cover. 200 square feet is 40 rolls of 5 square feet, or 1 pallet of 450.

Example measurements are filled in. Replace them with yours.

Area shape
The area you are measuring, drawn from your measurements in feet.20 ft10 ft

Measure the ground you will cover.

Leave out an area

Example quantities

200sq ft to order
40whole rolls or pieces
1whole pallet instead

Your order details
  • 200 sq ft to cover
  • 0% extra
  • 200 sq ft to order
  • 40 whole rolls or pieces at 5 sq ft each
  • 1 whole pallet at 450 sq ft each (alternative to rolls, not additional)
How it is calculated
  1. Part 1: 20 × 10 = 200 sq ft.
  2. Add the parts, then subtract 0 sq ft = 200 sq ft.
  3. Order area: 200 × (1 + 0 ÷ 100) = 200 sq ft.
  4. Rolls: round up 200 ÷ 5 = 40.
  5. Pallets instead: round up 200 ÷ 450 = 1.

Shown in feet and inches. Results are rounded for reading; whole bags and pieces use the full calculation.

Measure the lawn, leaving beds and paths out

Divide the lawn into rectangles, circles and triangles. Measure each part once, then subtract any planting beds or paving already inside those shapes. The result is ground area; sod thickness does not change how much lawn it covers.

Add your chosen extra for edge cuts and fitting. The calculator starts with none, so the measured lawn and the amount you order stay separate.

Use your sod farm’s roll and pallet sizes

There is no single pallet size. Ask how much ground one roll or piece covers and how much comes on one pallet. The example uses a 5-square-foot roll and a 450-square-foot pallet from Sod Solutions; replace both if your supplier sells different sizes.

Rolls and pallets are alternative ways to buy the same amount. Do not add them together. The calculator rounds each up separately; the supplier may also sell part pallets.

How much extra to order

Our guide is 5 to 10 percent extra for cutting around edges and curves. Saratoga Sod’s calculator adds 10 percent as its own line; Mississippi State University Extension suggests buying about 5 percent more than you think you need, and Purdue Extension about 10 percent.

Keep the soil order separate

If the site needs a new soil layer before laying sod, use the topsoil calculator for its depth and volume. Mark adjacent raised beds and check the space left for their paths before counting that ground as lawn.